Bldg. 38 & bldg. 233 Emergency Eyewash stations
Magnitude: $41,522.71
Completion Date: 12/1/2025
Customer: Naval Underwater Warfare Center (NUWC)
The Contractor furnished all labor, materials, equipment, and supervision and installed two ANSI-compliant emergency eyewash stations in Bldg. 38/233 (one on each building side). The Contractor provided tepid water (60–100°F) to each station by installing and connecting new hot/cold water piping, thermostatic mixing valves or point-of-use hot water equipment, and required valves, backflow prevention, insulation, and associated appurtenances, and tied into the existing water supply and wastewater systems as required. The Contractor coordinated activities with the COR, submitted required documentation (e.g., schedule, submittals, O&M manuals, warranties, and as-builts as applicable), and performed start-up and operational testing of both eyewash stations, verifying tepid water performance with Government witnessing.
DISCLAIMER: Agency does not permit CUI photos shared, this is an AI generated photo
bLDG. 81 eAST Awning Repair
Magnitude: $136,273.41
Completion Date: 1/22/2026
Customer: Naval Underwater Warfare Center (NUWC)
This project removed and replaced the Building 81 East Awning system by completing required asbestos-containing adhesive abatement and lead-paint controls, then demolishing the existing awning and installing new wall-hung aluminum awnings finished with a marine-grade coating to match the facility. The work also installed new gutters and downspouts tied into the existing drainage, completed associated electrical work including new conduit runs and exterior LED doorway lighting, and removed unnecessary exterior conduit/piping while rerouting or capping low-pressure air piping as needed. All disturbed penetrations and surfaces were repaired, sealed, and restored to a watertight condition, site areas were returned to their original condition, and required closeout and as-built documentation was delivered.
Bldg. 84 Refresh Lunchroom & Restroom
Magnitude: $132,763.92
Completion Date: 11/21/2025
Customer: Naval Underwater Warfare Center (NUWC)
We completed the renovation of Building 84’s restroom and lunchroom at NUWC Keyport, including demolition and surface preparation, installation of new epoxy flooring with rubber cove base, and repainting. In the restroom, we installed relocated ABA-compliant fixtures with required grab bars and accessories, replaced the floor drain and trap primer, replaced the exhaust fan, applied privacy window film, and installed a new door/frame/hardware with unisex signage. In the lunchroom, we installed Low-E window film and extended the epoxy flooring and cove base into the two adjacent offices as required. All work was executed in accordance with the contract documents and applicable facility standards.
DISCLAIMER: Agency does not permit CUI photos shared, this is an AI generated photo
What Sets Us Apart
People-First Approach
Everything we do is built around understanding your needs and helping you succeed—because when you thrive, so do we.
Long-Term Relationships
We’re not just here for the now. We love creating lasting relationships with our clients and growing with them over time.
Proven Process, Flexible Execution
We bring structure where it counts and adaptability where it matters. Our methods are clear, but always responsive.