USAO Paint 5th & 6th floors hatfield courthouse

Magnitude: $298,024.28

Completion Date: 9/15/2021

Customer: General Service Administration (GSA)

We provided furniture relocation and displacement services, including totes/crates as needed and “lift-and-shift” methods to support the work without unnecessary disruption. We coordinated with the agency to remove and reinstall wall hangings, boards, and related items to allow for surface repairs and painting access. We prepped wall surfaces by filling pinholes, dings, and imperfections (up to approximately 3,000 SF of gypsum wallboard repairs) to improve finish quality. We then painted all walls throughout the 5th and 6th floor USAO suites (approximately 160,000 SF total), applying a primer/base coat and a final color coat, including roughly 60,000 SF of accent walls across multiple coordinating colors selected by the USAO

DISCLAIMER: Agency does not permit CUI photos shared, this is the project location

Install ada openers for restroom

Magnitude: $17,200.41

Completion Date: 12/27/2020

Customer: General Service Administration (GSA)

We installed electrically powered ADA door openers for the men’s and women’s 7th-floor restrooms in compliance with GSA P100 and ABAAS requirements. Power was routed from the floor’s central electrical closet, and all work was completed per manufacturer recommendations. We removed and salvaged the interior privacy doors and associated hardware and stored them in the basement attic stock room. We patched and painted all affected areas, including door frames, with corner-to-corner painting to match existing finishes. Work was scheduled to minimize tenant impact and keep restrooms operational during normal building hours when active work was not underway.

DISCLAIMER: Agency does not permit CUI photos shared, this is the project location

FPD Portland Ballistic Windows

Magnitude: $14,805.20

Completion Date: 1/20/21

Customer: General Service Administration (GSA)

We installed two 36” x 40” Level III ballistic transaction windows with hollow metal frames on both sides of the reception counter and replaced two existing locksets with new hardware. We provided dust containment, salvaged floor monuments for reuse, and disposed of all waste off-site. We repaired wall surfaces to a smooth finish and primed and painted all affected walls and frames from corner to corner using low/no-VOC, first-line semi-gloss paint to match existing conditions, completing work after normal business hours and providing required advance notice. We also reinstalled carpeting removed for wall work and furnished/installed new rubber base at new walls and all areas impacted, matching existing color and style, and stained/finished the new door slab to match existing.

DISCLAIMER: Agency does not permit CUI photos shared, this is the project location

What Sets Us Apart

People-First Approach

Everything we do is built around understanding your needs and helping you succeed—because when you thrive, so do we.

Long-Term Relationships

We’re not just here for the now. We love creating lasting relationships with our clients and growing with them over time.

Proven Process, Flexible Execution

We bring structure where it counts and adaptability where it matters. Our methods are clear, but always responsive.